燃气热风炉在使用过程中应注意哪些?

时间:2019年04月01日信息来源:热风炉厂家 点击: 收藏此文 【字体:

开机前查看1.查看烘房内有无人员!2.查看燃气加热热风炉循环风机是否正常发动运转。(注:以上风机和燃烧器在电控中有连锁操控)以及各动力点的传动光滑气路无安全隐患。3.翻开燃气进口主阀调查压力表压力显现是否正常。4.闭合主电源。
Check before booting 1. Check if there is no one in the drying room! ___________ 2. Check whether the circulating fan of gas heated hot blast stove is running normally. (Note: The above fans and burners have chain operation in the electronic control) and there is no potential safety hazard in the smooth air transmission of each power point. 3. Open the main valve of gas inlet to investigate whether the pressure gauge is normal. 4. Close the main power supply. 二.开机运转
2. Start-up operation

1.发动废气风机(在烘房操控总柜上)
1. Start the exhaust fan (on the drying room control cabinet)

2.旋转电源操控旋钮至开位电源指示灯亮,温控表通电显现当时工况温度和设定 温度值。
2. Turn the power control knob to the open power indicator light, and the thermometer is electrified to show the working temperature and the set temperature.

3.按循环风机发动按钮,循环风机发动运转,指示灯亮(绿色)。
3. Press the start button of the circulating fan, the circulating fan will start and run, and the indicator light will be on (green).

4.按燃烧器发动按钮,燃烧器进入主动进入吹扫,燃烧。燃烧器正常燃烧运转后燃烧器运转指示灯亮(绿色)。
4. Press the burner start button, the burner enters into the active purge and burns. After the burner burns normally, the burner operation indicator lights up (green).

5.燃烧器燃烧或正常作业时操控器上指示灯显赤色(及毛病指示)。请按照供给的毛病扫除手册进行查看,毛病扫除后按操控器上红灯软按钮复位,指示灯由赤色改变为黄色,燃烧器进入正常燃烧作业状况。
5. When the burner burns or operates normally, the indicator light on the controller appears red (and fault indication). Please check according to the supplied defect cleaning manual. After the defect cleaning, press the soft button of the red light on the controller to reset. The indicator light changes from red to yellow, and the burner enters the normal combustion operation condition.

燃气锅炉厂家
Gas Boiler Manufacturer

6.燃烧器正常燃烧作业后,燃气量由调理侍服电机调理至最大量,燃气热风炉回风到达工艺设定温度(依据现场实际需求时设定值)时,经过电控中温控表输出信号主动调理侍服电机来调理燃气流量和助燃风的流量,来操控所需求的温度。
6. After normal burning operation of the burner, the gas quantity is adjusted from the conditioning service motor to the maximum. When the return air of the gas hot blast stove reaches the process setting temperature (set value according to the actual demand on the spot), the service motor is actively conditioned by the output signal of the electric temperature control meter to regulate the gas flow rate and the flow rate of the combustion-supporting air to control the required temperature.

7.燃烧器经调试后,作业压力及调理阀门不可随意调整
7. After the burner has been debugged, the operating pressure and regulating valve can not be adjusted at will.

燃气锅炉厂家提醒你定期查看燃气管路连接点是否有走漏。查看或毛病扫除时有必要封闭主电源!
Gas boiler manufacturer reminds you to check gas pipeline connection point regularly for leakage. It is necessary to close the main power supply when checking or troubleshooting.

设备运转后有必要有专人守时巡查,以便及时发现设备有异常情况
It is necessary to have a special person to inspect the equipment on time so as to find out the abnormal situation of the equipment in time.

三.关机
Three. Shut down.

1. 先按废气风机中止按钮,废气风机中止。(在烘房操控总柜上)
1. Press the stop button of the exhaust fan first, and the exhaust fan stops. (on the dryer control cabinet)

2. 按 燃烧器中止钮,燃烧器火焰平息。
2. Press the stopper button of the burner, and the flame of the burner will be calmed down.

3. 封闭燃烧器30—40分钟后主动中止燃气加热热风炉循环风机(电控中有延时操控) 。
3. Close the burner 30-40 minutes later, actively stop the circulating fan of gas heated hot blast stove (there is delayed operation in electronic control).

4. 封闭燃烧器进口燃气总阀。
4. Closed burner inlet gas main valve.

5.封闭操控电源。查看现场有无安全隐患,方可离人。
5. Closed operation power supply. Check the site for potential safety hazards before leaving.

四.以上操作步骤有必要遵照执行!
4. It is necessary to follow the above steps.
(作者:热风炉 编辑:admin)
文章热词:热风炉
产品展示:

热门文章

推荐文章